community

view case studies

Burns MonumentKilburn GrangeBathgate Swimming PoolEast Point Community CentreCraig ParkHaysham Village Community Centre
Wooburn Green Sports Pavilion

Heysham Community Centre

Case Study

A typical requirement for security – sports and community centres have high value contents and any security breach can have a damaging affect on the reputation and public use of the building. Alongside of this requirement, it is essential that the building design is welcoming to the community that it serves. Servicing these conflicting requirements can often be difficult; however, the Integr8 180LS Security Shutter system incorporates a very effective security barrier and glazing protection, whilst maintaining the visual aspect of the original building design.

Charter commenced work with the architect form an early stage in the detail design process, a RAL colour was chosen that further complimented the building design, interface with surrounding structural steelwork was assessed and incorporated alongside the structural lintel and the shutter controls were considered at a timely point in the design, all ensuring a seamless onsite experience; from delivery to installation to project completion.